Live Work Play Learn

City Home Page

Fire Main Page

Administration

Home Fire Safety

Visit a Fire Station

Firefighter Recruiting

Department News

Jr. Fire Cadets

Audio of an Alarm

Recent Fire Alarms

Hazmat

Contact Us

September 2009 Alarms

November 2009 Alarms


Recent Fire Alarm Statistics

Types of Alarms

October 2009 Alarm Totals

33 – 1st Alarms (structure fires)
0 – 2nd Alarm (additional units)
1 – 3rd Alarm (additional units)
501 – EMS Alarms (medical, automobile accidents, etc.)
64 – Supervisory Alarms (Smoke alarm activations, water flow alarms, pull stations, etc.)
127 – Still Alarms (illegal burning, car fires, gas leaks)
0 – Airport Alerts (aircraft crash)
0 – Fire Investigations (investigator requested by police, previous fire where no fire company responded)
726 – Total Incident Count

10/31/2009 - 118 South Stone St.
Second Battalion (E-2, E-1, E-3, E-6, T-2 & BC-1) responded to a 1st Alarm for a house fire. E-2 reported light smoke showing from the attic. E-2 advanced preconnect through the rear door to the fire and extinguished. T-2 conducted primary search then assisted with ventilation. E-6 deployed a back up line. E-1 assisted E-2 with locating the fire and conducting a search. E-3 was assigned the RIT.

10/04/2009 - 3944 North Warren St.
Second Battalion (E-5, E-1, E-3, E-4, T-1 & BC-1) responded to a 1st Alarm for a house fire. On arrival E-5 reported heavy smoke and flames coming from the front of the house. E-5 advanced preconnect to the fire in the laundry room and extinguished. T-1 ventilated the roof and then assisted with overhaul. E-1 established a water supply and then performed a primary search. E-4 checked for extensions into the attic. E-3 was assigned the RIT.

10/02/2009 - 1412 East Leafland Ave.
Second Battalion (E-1, E-2, E-4, E-5, T-2 & BC-1) responded to a 1st Alarm for a house fire. On arrival E-1 reported smoke showing from the structure. E-1 advanced preconnect to the fire and extinguished. E-2 advanced preconnect to the basement and extinguished the fire there. T-1 ventilated the roof and performed overhaul. E-4 assisted E-1 with overhaul. E-5 assumed the RIT assignment.